City of West Palm Beach, FL
Home MenuI Want To... » List & Detail Pages
News List
WPB ROAD & DOCK CLOSURES UPDATE: WEEK OF SEPTEMBER 20, 2020
CITY OF WEST PALM BEACH ENGINEERING ROAD CLOSURES
- S. Dixie Hwy., between Clematis St. and Datura St. (Tuesday, September 22, 2020, 9:00 p.m. until Wednesday, September 23, 2020, 5:00 a.m., and Wednesday, September 23, 2020 9:00 p.m. until Thursday, September 24, 2020, 5:00 p.m.): Road closed overnights for underground utility work.
- Banyan Complete Streets Project- Phase 1: Banyan Blvd. between Australian Ave. and Quadrille Blvd. (through 2022): Intermittent eastbound traffic adjustments for mobility, landscaping, and utility improvements. Eastbound and westbound traffic on Banyan Blvd. will be maintained during the construction period. Motorists should expect lane adjustments.
- South Olive Ave. between Okeechobee Blvd. and Southern Blvd. (through Friday, October 30, 2020): Intermittent lane closures for the installation of traffic calming devices, pavement striping, and crosswalk upgrades.
- Executive Center Dr. between South Congress Ave. and the east cul-de-sac (through Friday, October 30, 2020): Intermittent lane closures for pavement striping, and crosswalk upgrades.
- 7TH St. between Rosemary Ave. and Sapodilla Ave. (through September 2020): Road closed for utility work.
EVENTS ROAD CLOSURES
- 500 Block Merchant Weekend Street Closure produced by DDA (Friday, September 18, 2020, 4:00p.m. until Sunday, September 20, 2020, 10:00p.m.) Road closure for 500 block of Clematis St.
- GreenMarket Preparations at Centennial Square produced by CWPB Community Events (Sunday, September 27, 2020, 9:00 a.m. until 4:00 p.m.) Road closures:
- 200 block of Clematis St (from Pioneer Linens parking lot east to Narcissus Ave.)
- Narcissus Ave. from Banyan Blvd. to Datura St.
- 100 block of North and South Clematis St.
Greenmarket at Centennial Square returns Saturday, October 3, 2020 9:00 a.m. until 1:00 p.m.
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS ROAD CLOSURES IN CITY OF WPB
- Community Dr. at the southwest corner of Military Tr. (until further notice) : Periodic eastbound right lane closures for utility work.
- Palm Beach Lakes Blvd. intersections at Spencer Dr., Village Blvd., and Tamarind Ave. (until further notice): Periodic lane closures for pavement markings.
- Carver Ave. at Palm Beach Lakes Blvd. (through Friday, October 16, 2020): Intermittent lane closures for the relocation of the water main. Detours will guide motorists around the construction zone.
- Belvedere Rd. west of Australian Ave. (until further notice): Periodic westbound right lane closures and northbound left-turn lane closures at Australian Ave. for utility work.
- 45th St at Corporate Wy. (until further notice): Westbound left turn lane closure for road improvements.
- 45th Street east of Premier Park Dr.to the northeast corner of Military Trail (until further notice): Periodic westbound lane closures and periodic northbound left-turn lane closures at Military Tr. for utility work.
- 45th St. east of northbound I-95 to the northwest corner North Shore Drive (until further notice): Periodic westbound right lane closure for utility work.
- North Jog Rd. from Okeechobee Blvd. to Roebuck Rd. (until further notice): Periodic lane closures for pavement markings.
- North Australian Ave. from 53rd to 45th St. (until further notice): Periodic southbound lane closures. Periodic northbound left turn lane and westbound right lane closures at 45th St. and North Australian Ave. for utility work.
- Roebuck Rd. from Jog Rd. to Haverhill Rd. (until further notice): Periodic lane closures with flaggers controlling traffic for road construction.
- For more information, contact PBC Engineering & Public Works: (561) 684-4000 or http://discover.pbcgov.org/Pages/Roads.aspx
FLORIDA DEPT OF TRANSPORTATION (FDOT) ROAD CLOSURES IN CITY OF WPB
- I-95 northbound and southbound on-ramps at Okeechobee Blvd. (through Spring 2021): Three I-95 southbound inside lanes will be closed nightly at Okeechobee Boulevard, Sunday through Thursday, beginning Sept. 20. Two lanes will close at 9 p.m. and the third lane will close at 11:30 p.m. All lanes will open at 5 a.m. Detours:
- Eastbound traffic approaching the I-95 northbound on-ramp will be directed east to U-turn at Parker Ave., then west on Okeechobee Blvd. to the northbound on-ramp.
- Westbound traffic approaching the I-95 southbound on-ramp will be directed west to U-turn at Church St., then east on Okeechobee Blvd. to the southbound on-ramp.
- Eastbound Okeechobee Blvd. between Palisades West Dr. and Andros Isle (through Monday, October 5, 2020): Two of four lanes closed, 9:00 a.m. until 5:00 p.m., Monday through Friday, for pole removal and installation.
- Westbound Okeechobee Blvd. between Australian Ave. and South Rosemary Ave. (through Wednesday, October 14, 2020): One of four lanes closed, 9:00 a.m. until 3:30 p.m., Monday through Friday, for directional boring installation.
- Westbound 45th St. between Congress Ave. and Village Blvd (through Friday, October 16, 2020): One of three lanes closed, 9:00 a.m. until 3:30 p.m., Monday through Thursday, for directional bore installation.
- Westbound Lakeview Ave. at intersection South US Dixie Hwy. (through Friday, October 30, 2020): One of three lanes closed, 9:00 a.m. until 3:30 p.m., Monday through Thursday, for directional boring and conduit installation.
- Northbound South Quadrille Blvd. between Okeechobee Blvd. and Clematis St. (through Friday, October 30, 2020): One of two lanes closed, 9:00 a.m. until 3:30 p.m., Monday through Friday, for directional boring installation.
- Eastbound Okeechobee Blvd. between South Quadrille Blvd. and South Flagler Dr. (through Friday, October 30, 2020): One of three lanes closed, 9:00 a.m. until 3:30 p.m., Monday through Friday, for directional boring installation.
- Flagler Dr. between Southern Blvd. and Worth Ct. North. (through summer 2020): will be closed for roadway reconstruction as part of the Southern Blvd. bridge replacement project. Access is maintained for local traffic only. Flagler Dr. sidewalks, from Southern Blvd. to Worth Ct. N., and the Southern Blvd. south sidewalk, from Washington Rd. to Flagler Dr., will remain closed through summer 2020. Detours:
- Traffic going north of Flagler Dr. should:
- Go west on Worth Ct. N. to Washington Rd.;
- Go north on Washington Rd. to Southern Blvd;
- Go east on Southern Blvd. to Flagler Dr.
- Traffic going south on Flagler Dr. should:
- Go west on Southern Blvd. to Washington Rd.;
- Go South on Washington Rd. to Worth Ct N.;
- Go east on Worth Court N. to Flagler Dr.
- Pedestrians using Flagler Dr. between Southern Blvd. and N. Worth Ct. should:
- Use the east Flagler Dr. sidewalk.
- Pedestrians using Southern Blvd., between Washington Rd. and Flagler Dr. should:
- Use the north Southern Blvd. sidewalk.
- For more information, contact FDOT: (866) 336-8435 or http://www.fdot.gov/.
CITY OF WEST PALM BEACH DOCKS
- Currie Park Boat Docks and Ramps (2400 North Flagler Dr.): Ramps are open daily, sunrise to sunset.
- Lake Mangonia Park Boat Ramps (2957 North Australian Ave): Ramps are open daily, through Sunday, sunrise to sunset.
- Clematis St. Docks (South Clematis St. at South Flagler Dr.): Docks are open daily, 5:00 a.m. until midnight.
- Fern St. Dock (Fern St. at South Flagler Dr): Docks are open daily, 5:00 a.m. until midnight. The Fern St. Dock is available for day docking only. No overnight dockage allowed for boats including dinghies or kayaks.
- Please follow COVID-19 CDC guidelines and local orders governing facial coverings.
Sign up for eNotify road and traffic alerts: https://www.wpb.org/things-to-do/sign-up-for-enotifications-from-the-city-of-wpb
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed via the Waze app or online at
https://www.wpb.org/government/communications/road-and-dock-closures
To contact the City of West Palm Beach traffic/transportation/engineering office, please call (561) 494-1040 (TTY 800-955-8771).