City of West Palm Beach, FL
Home MenuDixie Highway Lane Repurposing Study
From 25th Street to Quadrille Boulevard
Thank you for attending this meeting
and providing valuable feedback.
The Dixie Highway Lane Repurposing Project is an outcome of the US-1 Multimodal Corridor Study, a 42-mile, collaborative plan that established a vision for multimodal infrastructure along US-1 corridor throughout Palm Beach County. The US-1 Multimodal Corridor Study was approved by the Palm Beach Transportation Planning Agency (TPA) Governing Board in May 2018.
The City of West Palm Beach and the TPA are seeking to proceed with the recommendations from the US-1 Multimodal Corridor Study, which included converting the existing 4-lane roadway section to a street with one travel lane in each direction, buffered bicycle lanes, and a center-turn-lane between Quadrille Boulevard and 25th Street on US 1 (Dixie Highway). The proposed lane configuration is intended to increase safety, meet the vision of local stakeholders to better match the land use and character of the community, creating a more comfortable experience for all roadway users and support the City's objective to increase mobility.
This is a study, and no decisions have been made. Click to view the PowerPoint slides displayed at the meeting.
Project Limits
Dixie Highway (US 1) from 25th Street to Quadrille Boulevard
Dixie Highway Lane Repurposing Study Fact Sheet
For more information, please contact:
Jessica A. Keller, ENV SP
Mobility & Transportation Manager
Engineering Services Department
City of West Palm Beach
Email: jkeller@wpb.org
(561) 917-4317